PJT performed
Customer | Equipment | Application | Q’ty | Remark |
---|---|---|---|---|
POSCO | 1 thick plate furnace oxygen lancing |
Total Engineering | No. 1 | SV contract and trial run completed |
POSCO | 2 hot-rolled furnace oxygen lancing |
Total Engineering | No. 4 | SV contract and trial run completed |
Hyundai Steel | W/B furnace (210 Ton/hr) | HSCS & LANCING system application | No. 1 | Fuel saving more than 4% |
POSCO | #3 CAL Furnace | Fuel switching construction Engineering & DCS |
No. 1 | COG->LNG 300 burners |
Doosan Heavy Industries & Construction |
Furnace and heat treatment furnace |
HSCS & LANCING system application | No. 7 | Fuel saving more than 14% |
Doosan Heavy Industries & Construction |
Furnace and heat treatment furnace |
Adding furnace pressure damper and adjusting fuel efficiency |
No. 33 | Fuel saving more than 10% |
KORENO | Environmental equipment RTO |
Equipment inspection and blast resistant construction |
No. 1 | Equipment inspection and blast resistant construction |
Iljin Steel | Round furnace | Blast resistant construction | No. 1 | |
Hyundai BNG Steel | AP Furnace | Blower & fan inverter application | No. 1 | Combustion air pressure profiling |
LG Electronics | PDP consistent furnace | C mode of exhaust cart application | No. 2 | 200 carts for wire and wireless use |
Yeosu Power Plants | Water treatment system | Modular electrolysis device | No. 2 | Water treatment plant |
POSCO C&C | VOC thickener | Installation and trial run | No. 1 | Air treatment plant |
POSCO C&C | RTO | #1 CCL | No. 2 | Replacing thermal mass and valve |
POSCO C&C | RTO | #2 CCL | No. 2 | Replacing thermal mass and valve |
POSCO C&C | RTO | #3 CCL | No. 1 | Replacing thermal mass and valve |
Fine Besteel | WBF furnace | Furnace CAPA ‘ UP | No. 1 | 60 TON/ HR=>70 TON / HR |